24The contractor team that Mt Hood Forest Homeowners Association hired,21 David Linn Trucking, laid over 15 tons of cold mix asphalt to repair the large pot holes on all asphalt cabin roads and 12 loads of gravel to repair5 the gravel road pot holes.

Your cabin association spent $15,000 on these repairs as well as the USFS contribution of $2500 that will supply piles of gravel on roads that can be used for your driveways or other smaller pot holes.   Respond to this post or email us at info@mhfha.com to request some gravel for your cabin road.

If you have not yet paid your MHFHA dues for 2017, please send them in today as we need everyone’s support to bring this type of road repair that benefits all cabin owners.

19 16sign

14